All Projects
Tesla Field cinematography

Deploying Megapack At Scale

Tesla · Megapack 3 deployment film

Tesla's flagship Megapack film follows utility-scale battery storage from the factory floor to the grid. The closing sequences, where Megapack 3 units are craned into place and connected on site, are the footage I shot.

Problem

The deployment story needed real Megapack 3 units in the field, not renders, captured on an active construction site with crane lifts, crews, and safety windows that don't wait for a camera.

Solution

Planned the shoot around the crew's lift schedule and exclusion zones, then captured the install sequence (rigging, lift, set, connection) with coverage that could cut cleanly into Tesla's existing edit and grade.

Result

The Megapack 3 install footage closes the published film on Tesla's YouTube channel, the first public look at Megapack 3 being deployed.

Role Content Producer, Tesla
Contribution Megapack 3 field sequences
Published YouTube ↗
Year 2026
Next Project Megapack 3 Launch Day